KMPR POWEREnergizing India
Check My Feasibility

Open Access Solar · Andhra Pradesh

Direct solar power for Andhra Pradesh industries — Rs. 4.30 / unit, locked for 25 years.

40 MW operational. Zero Discom dependency. Two ownership models. Investor-backed, not bank-financed.

40 MW

Solar Capacity

30 MW

Wind Capacity

Rs. 4.30

Per Unit Tariff

25 Yrs

PPA Tenure

Live Generation

Units generated by KMPR since launch:

kWh — and counting.

Click the number to see how it's calculated.

The Challenge

The problem with Discom power

Rs. 7–9 / unit

Average industrial tariff from Discom — nearly double what we charge.

8–12% p.a.

Annual tariff escalation baked in every regulatory cycle.

Unreliable

Voltage fluctuations and unplanned outages disrupt production schedules.

No certainty

Tariff can change any regulatory cycle — zero long-term visibility.

Our Solution

Solar power in three steps

1

Generation

We own and operate the 40 MW Madakasira solar plant in Andhra Pradesh. Power is generated at the plant and injected into the state's transmission network at utility scale.

2

Transmission

Under open-access regulations, your allocated units travel over the existing APTRANSCO grid to your nearest substation — no new infrastructure required at your end.

3

Delivery

You receive clean solar power at your facility meter at Rs. 4.30/unit. We handle all regulatory filings, open-access banking, and balancing so your team focuses on production.

Ownership Models

Two ways to buy solar

Model 1

PPA Model

Power Purchase Agreement

  • No capital investment — zero CapEx
  • Fixed tariff: Rs. 4.30 / unit for 25 years
  • KMPR owns, operates, and maintains the plant
Learn more →

Model 2

BOOT Model

Build · Own · Operate · Transfer

  • KMPR builds and funds the plant on your behalf
  • You operate at preferential rates during the agreement
  • Full ownership transfers to you at end of term
Learn more →

Industries We Serve

Sectors served

Steel
Pharma
Cement
Food Processing
Tyres
Textiles
Hospitals
Industrial Clusters
Government

10-Second Qualification Test

Will open access work for you?

My facility is in Andhra Pradesh.

My sanctioned load is 2 MW or more.

I am connected at (or can move to) 33 kV.

Answer all three to see your result.

Get Started

See if your facility qualifies — in 24 hours

Leave your details and our team will run a preliminary feasibility assessment at no cost.